| This is the first building I started in this project. It was also the first building completed, digitally and with actual bricks. |
 |
 |
 |
|
 |
 |
| 2/5/03 |
2/6/03
Fixed gear spokes; started adding "water" |
2/7/03
Completed version 1 of wind vane. I'm not sure
I'm happy with it. |
2/8/03
I have to re-do the clock face because my other
idea won't work in real life. This is my first draft of a new
idea. |
2/8/03
I think the Clock Tower is almost done. I just
need to finish the inside, and give it a marker switch.
|
2/8/03
Purely artistic. I did add a bit more "water" around
the stepping gears.
2/9/03: 1280x1024
version with new gears added. |
 |
 |
 |
 |
 |
 |
2/15/03
I'm just trying out another rendering technique. Also, I've
corrected the door so that it now swings out, I've added the
7th stepping gear, and I've added a the clock controls. |
2/16/03
I think I finally figured out the levers for inside... |
2/16/03
...and here's a shot using the levers. |
2/19/03
This picture is using a technique called radiosity. |
4/16/03
I
tried another render with radiosity... Way too light. Oh well.
This is also the first image with my attempt at a marker switch.
|
4/16/03
The reason there haven't been more updates recently is because
I've been working on generating instructions for the clocktower,
This is a possible look for those instructions. |
 |
 |
 |
 |
|
|
4/18/03
Another render of the image posted on the 16th,
using different settings. |
4/20/03
Normal |
4/20/03
With focal blur. |
4/20/03
With focal blur and radiosity.
Render time: 10 hours, 47 minutes |
|
|